In 2013, Redpath Mining Contractors engaged Wilshaw to design and supply steel can ventilation liners for Saracen’s inaugural underground operation, Red October Gold Mine.
The project was a collaboration between Redpath Mining Contractors, PYBAR Mining Contractors, Saracen and Wilshaw.
Redpath Mining Contractors drilled a 4.5 metre diameter raisebore and Wilshaw supplied 35 metres of steel can liners to line the raisebore to provide the mine with a primary return air way (RAR).
Raiseboring is a valuable way to develop a variety of rises for underground mining operations.
As well as the expertise to design and manufacture raiseboring equipment, we provide consulting services to optimise or troubleshoot raiseboring systems.
Some of the raiseboring equipment we design and manufacture includes:
For more information about our raiseboring services or any of our design and certification services, call +61 8 9479 0800 or email info@wilshaw.com.au.